Installation project during building rehabilitation. I pitched the idea to the president of the company, created the mock-ups and illustrations, acted as sole designer, chose the materials, and participated with project oversight. Installation pieces were featured on all five floors of the building in the corresponding elevator lobbies.
Final design mock-ups.
Final design mock-ups.
Signage mock-up.
Signage mock-up.
Signage mock-up.
Signage mock-up.
Signage mock-up.
Signage mock-up.
Signage mock-up.
Signage mock-up.
Signage mock-up.
Back to Top